Our Projects
Our projects from recent years


Industrial Warehouse, Essex
This client came to us as they wanted their flooring renewed as it was an engineering workshop for 40 years and as a result the existing floor was covered in oil.
We carried out a lot of tests and research into what we could use and working with Arturo and Uzin we came up with a solution and pictured on the right was the end result.


Penthouse, Earls Court - London
This penthouse was previously flooded, in order to put the flooring right we used Uzin NC196 levelling compound.




Lio Club, London
This was formerly known as Café de Paris in London. The clients wanted to restore the existing flooring as requested by British Heritage and this 100 year old mosaic and terrazzo flooring pictured was the end result.


Penthouse, London
This penthouse overlooks Stamford Bridge, it was previously flooded. The existing flooring was removed and we had to build it up 150mm with insulation and 30mm of Uzin NC 196.


Bromley Town Hall
For this project we restored the existing 100 year old parquet flooring which was covered in a levelling compound and carpet glue to bring it back to its glory. We used junckers MT500 floor lacquer.


National Gallery - London
Restoration works and levelling compound works to the old part of the National Gallery.